Inspection and Testing to AS1851

  1. Infrastructure
  2. Commercial & Industrial
  3. Education
  4. Hotels
  5. Strata
  6. Data Centres

View Service

Category: Uncategorized

Fire Equipment Repairs and Maintenance

  1. Fire Panel Programming
  2. Fire Pump Repairs
  3. Exit & Emergency Lighting Replacement

View Service

Category: Uncategorized

Annual Fire Safety Statements

  1. We remind you every 1/6/12 months
  2. Accredited Practitioners (Fire Safety) - (APFS)
  3. Fire Safety Assessor (FSA)

View Service

Category: Uncategorized

Council Fire Order Upgrades

  1. Fire Doors
  2. Smoke Alarms
  3. Smoke Detection Systems

View Service

Category: Uncategorized

Fire Systems and Equipment

  1. Fire Extinguishers & Hydrants
  2. Smoke Alarms
  3. Fire Sprinklers & Suppression Systems

View Service

Category: Uncategorized

Office Fit Out

  1. Sprinkler System Re-locations
  2. Smoke & Heat Detection Re-locations
  3. As-Built Drawings and endorsed designs

View Service

Category: Uncategorized

Client:

Newington College

Project Type:

Fire Safety Upgrade

Building Type:

Sports Centre

Location:

Sydney

Situation

We were engaged by this long-term client to extend the fire detection and Early Warning Intercommunication Systems throughout the Taylor Sports Centre, enabling greater control of their staff and students in an emergency.

Actions Taken

Benefits of the upgrade include:

 

+ Installed new Notifier 3030 detection system, which was added into the existing school detection network.

 

+ Installed detection through entire building, including Xtralis OSID beam detectors in the sports courts and pool areas.

 

+ Installed new Notifier I-2000 emergency warning system and added this onto the existing warning
system network.

Outcomes

+ Successfully ran a full-school evacuation and lockdown test with all staff and students safe and accounted-for; therefore, proving the effectiveness of the upgrade.

 

+ Site-wide control of fire system from the main fire indication panel (FIP).

 

+ Individual buildings can be isolated at the main FIP, with remainder of school being left operational.

 

+ Site-wide manual operation of the warning system and public address from central location – including integration of the site’s existing school PA, bells and announcement system.

 

+ Site-wide “lockdown” integrated into the warning system and this can now be activated from any of the panels in an emergency.

Request a free quote and report valued at $750

Free Site Visit & Safety Quote

Complete this form and receive our free:

Make the process easy by choosing the fire safety practitioners that give you the least headaches!

"*" indicates required fields

RELATED

CASE STUDIES

COMMERCIAL OPERATIONS

Fire System Fitouts Review

View Case Study

OFFICE BUILDINGS

Strata Manager Interview: AFSS, Inspections & Testing.

View Case Study

COMMERCIAL OPERATIONS

Inspection and Testing

View Case Study

CLIENTS THAT TRUST US

TESTIMONIALS