Inspection and Testing to AS1851

  1. Infrastructure
  2. Commercial & Industrial
  3. Education
  4. Hotels
  5. Strata
  6. Data Centres

View Service

Category: Uncategorized

Fire Equipment Repairs and Maintenance

  1. Fire Panel Programming
  2. Fire Pump Repairs
  3. Exit & Emergency Lighting Replacement

View Service

Category: Uncategorized

Annual Fire Safety Statements

  1. We remind you every 1/6/12 months
  2. Accredited Practitioners (Fire Safety) - (APFS)
  3. Fire Safety Assessor (FSA)

View Service

Category: Uncategorized

Council Fire Order Upgrades

  1. Fire Doors
  2. Smoke Alarms
  3. Smoke Detection Systems

View Service

Category: Uncategorized

Fire Systems and Equipment

  1. Fire Extinguishers & Hydrants
  2. Smoke Alarms
  3. Fire Sprinklers & Suppression Systems

View Service

Category: Uncategorized

Office Fit Out

  1. Sprinkler System Re-locations
  2. Smoke & Heat Detection Re-locations
  3. As-Built Drawings and endorsed designs

View Service

Category: Uncategorized

Client:

Sherington Project Management

Project Type:

Multiple Fire Protection System Fit Outs

Building Type:

Commercial Strata

Location:

Sydney – Citywide

Situation

Sherington Property Management have appointed 2020 Fire Protection to modify the fire protection systems of a number of their client’s premises over recent years. Company Founder Tom Sherington agreed to be interviewed to review our performance with these ‘fitout’ projects.

 

Tom says: “These projects began with designs from specialist engineers. These independent designs have enabled fair competitive tender processes, which 2020 Fire have won.

 

“Sprinkler heads, smoke detectors, hose reels, fire extinguishers and other fire safety equipment have specific spacing guidelines required by the building code and Australian Standards. Therefore, our clients needed to modify their fire protection systems as the equipment installed was custom designed for the spacing of previous building layouts.”

 

Common building modifications that have required new fire protection system fitouts include changes to wall positioning, paths of travel, ceiling types and new obstructions.

Actions Taken

At these client buildings, 2020 Fire Protection have modified or supplied and installed:

• Fire sprinkler systems.
• Emergency warning systems.
• Fire hose reels.
• Gas suppression systems.
• Fire / smoke detection systems (including VESDA.)
• Fire hydrant systems.
• Fire extinguishers.
• Exit & emergency lighting.

Outcomes

Tom appreciated that the fitouts and Australian Standard Integrated Systems Testing required were all clearly explained, and that there were no extra costs, which helps keep his clients happy.

 

“The reporting and job completions delivered less headaches than my experiences with other fire protection suppliers. We’ve now done lots of projects with 2020 Fire Protection, and I’m completely satisfied!”

Request a free quote and report valued at $750

Free Site Visit & Safety Quote

Complete this form and receive our free:

Make the process easy by choosing the fire safety practitioners that give you the least headaches!

"*" indicates required fields

RELATED

CASE STUDIES

OFFICE BUILDINGS

Newington College Upgrade

View Case Study

COMMERCIAL OPERATIONS

Intermain A-Grade Conversion

View Case Study

COMMERCIAL OPERATIONS

Ventia Road Tunnel

View Case Study

CLIENTS THAT TRUST US

TESTIMONIALS